yantan hydropower station
岩滩水电站───yantan hydropower station
Yantan Hydropower Station firstly adopted the vertical ship elevator with steel cable winding.───岩滩水电站是国内首次采用钢丝绳卷扬提升、部分平衡、船厢下水式垂直升船机。
This paper introduced construction technique of the inverted vertical line survey system, boring, hole slope measuring, slope correcting, etc. of the Yantan hydropower station.───介绍岩滩水电站大坝倒垂线观测系统的倒垂线孔钻孔的孔斜控制、孔斜测量、孔斜纠偏等施工技术及廊道内遇长岩芯的处理方法。
Design of Load Form for Prestressed Beam of the Ship Lift Machine Floor of Yantan Hydropower Station───岩滩升船机主机层预应力梁板承重模板设计
Application of total-station instrument in measurement of deformation of ship chamber of vertical shiplift at Yantan Hydropower Station───全站仪在岩滩水电站垂直升船机承船厢变形观测中的应用
Application of dynamic control dispatching level of the reservoir of Yantan Hydropower Station during flood period───水库汛限水位动态控制调度在岩滩水库的应用
After the impounding of Yantan Hydropower Station , serious, water log occurred in some districts reservoir.