Riprap
抛石───Riprap
calculation results of scour depth and stabilization of riprap are consistent with the actual situation.───冲深与抛石稳定性的计算与实际工程的结果较为一致。
Use gabion wall system, terraces, riprap, and less concrete to protect the riverbank.───利用石笼墙系统、阶梯、抛石和少量的混凝土保护河岸。
Common problems and their solutions are put forward in riprap-filled sea formation during bored pile execution.───提出了在抛石填海地层钻孔灌注桩施工中常见问题及处理方法。
The article explains the construct quality control and check methods of underwater riprap bank in detail.───文章介绍水下抛石护岸施工质量控制措施与检验的内容.
Based on material choosing, mix design, and construction, polypropylene fibre concrete used in riprap consol - idarion work is introduced.───从材料选择 、 配和比设计 、 施工方法等方面介绍了聚丙烯纤维混凝土在某海漫加固工程中的应用情况.
Riprap protection of bank was applied in the middle and lower Yangtze River and many other rivers at home and abroad.
The area of riprap protection, protective revetments and silt arrester projects shall be defined in accordance with the approved design documents.
A formula reflecting the stabilization of riprap in a closure work and of groyne head apron is thus deduced.
They riprapped the dykes of the reservoir with stone.
Construction measures and quality control methods of underwater riprap protection of bank are provided, and a practical example is given.